Construction and the built environment

Interior systems installer - Suspended Ceiling & Partitioning Systems

Installing, repairing and maintaining various elements of the internal structure of a building.

Summary

This occupation is found in the Construction and Built Environment industry including new-build, renovation and refurbishment.  It is a specialist contracting occupation largely involved in the construction of partitions, walls and ceilings.  The Interior Systems sector alone has over 35,000 operatives working on extremely diverse projects in hotels, schools, airports, football stadiums, hospitals, shopping centres.  However other projects may mean working on security controlled installations such as Military Bases which may never be seen or used by the public.  Interior Systems operatives have also played a major part in the construction on iconic structures which are known throughout the world and include Canary Wharf, the Olympic Stadium, Battersea Power Station and the Shard. This is a fast growing sector with many opportunities for career progression into site supervision and management position which can lead to running their own businesses.

The broad purpose of the occupation is to install, repair and maintain various elements of the internal structure of a building to a high standard.  (e.g. ceilings above and walls around the structure.)

In their daily work, an employee in this occupation interacts with other colleagues, other trades, site supervisor, site manager, end users, main contractors and suppliers.  Environments could range from internal and external construction sites to occupied buildings eg large commercial properties or residential tower blocks with apartments and specialist buildings such as car showrooms.  The work would usually be during normal weekday hours but unsocial hours may also be necessary.  The work will be physically active, including lifting and fixing systems into place.  Work could be at height from a platform or mobile scaffold and operatives will need to follow strict safe working practices at all times in whichever occupational area they choose. They will report to a supervisor or site manager and be capable of managing their own time, quality and resources to meet deadlines and specifications. 

This is a core and options standard with two pathway routes with: 

  1. Drylining - methods to install different drylining systems that form the walls and rooms within a building, often used to hide wires and pipes whilst improving acoustics and create space for insulation.
  2. Ceiling and Partitions.- incorporates different ceiling and partition systems within a building. Used to provide different types of working environments, taking account of lighting and other fixtures.

Typical job titles include

Knowledge, skills and behaviours (KSBs)

K1:

General principles of building design and regulation particularly in relation to interface with internal construction. Including: How fire spreads through a building, how to impede it and protect the structure; noise nuisance, noise transfer, noise reverberation and to reduce it with improved acoustics; vibration and how to reduce it; the need for air and water barriers (Vapour Control Layer’s (VCL)Damp Proof Membrane’s (DPM)) to seal a building, how these work, materials used and where they are found)

K2:

The different methods to install dry lining systems to metal and stud partitions framed wall linings, framed and frameless beam and column encasements

K3:

The importance of health and safety, how to work safely, including working at height and use of access equipment (e.g scissor lifts, Mobile towers) asbestos awareness and manual handling. The appropriate additional Personal Protective Equipment (PPE) which may be required for various tasks eg cutting metal, drilling, shot-firing

K4:

The purpose and importance of risk assessments, method statements and Control Of Substances Hazardous to Health (COSHH) assessments

K5:

How to calculate quantity, length, area and wastage from sources such as setting out drawings, using BIM, digital working and Computer Aided Drawing (CAD)

K6:

How to identify suitable materials, components, equipment and resources in accordance with project specification (e.g. fire, acoustics, deflection requirements)

K7:

The tools, equipment, plant and machinery appropriate for use in each project type. e.g. scaffold, Mobile Elevated Work Platforms (MEWPs), nail gun, circular saw, lasers

K8:

The industry standards which cover the interior systems sector including BS 5234-1:1992, BS 8000-0:2014, BS 8000-8:1994, BS EN 13964:2014 and FIS Best Practice Guidelines

K9:

How to utilise materials in accordance with manufacturer’s instructions

K10:

he importance of clean and tidy environment and the impact on zero/low carbon outcomes in the built environment

K11:

The importance of occupational health mental health and how to deal with stress and conflict, inherent in the workplace, eg drugs and alcohol, face fit testing, dust, noise, vibration, asbestos

K21:

The different materials and methods of installation, dis-assembly and removal used in demountable partitions components for the various partition (e.g. glass and blinds) and ceiling (e.g. Tee grid, Mineral and metal concealed grid, Mineral and metal plank, Acoustic rafts, Vertical baffles) manufacturers eg Komfort, Sektor, Ocula, SAS, OWA, Armstrong

K22:

The various finishes that can be applied to partitions, the methods of applying finishes and the differing methods for different manufacturers

K23:

he different types of glass used in demountable systems. The dangers of glass and how to safely handle glass panels

K24:

The different types of blind used, the methods of operation, remove, repair and maintain and how to adjust them

K25:

The different types, weights, finishes, performance and seals for various doors and how to adjust doors and door furniture

K26:

The different performances required for demountable partitions and ceilings and what is required to achieve the specified acoustic and fire performance and protection

K27:

The range of perimeter trims and transition trims

K28:

Hanger systems and how the types and centres differ across systems, loading and whether there is a need for a subgrid

K29:

The appropriate use of pattresses, loading specifications and limitations of the ceiling systems

K30:

The importance of setting out and suspension of acoustic rafts and baffles

Technical Educational Products

Reference:
OCC0388B
Status:
Approved occupation imageApproved occupation
Average (median) salary:
£33,010 per year
SOC 2020 code:
5321 Plasterers
  • SOC 2020 sub unit groups:
    • 5321/01 Dry liners
    • 8159/05 Ceiling fitters
S1:

Measure and set out from drawings provided and check vertical and horizontal datum

S2:

Select the appropriate materials, tools and equipment in accordance with the specification requirements and or manufacturer specific instructions

S3:

Safely and correctly operate tools and equipment, plant and machinery appropriate for use. (e.g. scaffold, MEWPS, nail gun, circular saw, lasers

S4:

Apply fire and acoustic mastic seals in accordance with specification, designs details and manufacturers recommendations

S5:

Accurately measure and cut components (e.g. metal sections, plasterboard, insulation, timber and plywood)

S6:

Appropriately fix all components according to specifications and/or drawings

S7:

Effectively protect surround surfaces and segregate work areas and cutting areas

S8:

Install dry lining systems to metal and stud partitions framed wall linings, framed and frameless beam and column encasements

S9:

Clearly communicate with management, customers and colleagues including other trades onsite

S10:

Maintain a clean and tidy environment, appropriately disposing of waste according to site procedures

S11:

Identify and select appropriate PPE for the task

S12:

Install pattresses

S13:

Install insulation

S14:

Form service penetrations through partitions

S15:

Install primary channels or main runners to line and level. Cut to length

S16:

Frame and fit access panels

S26:

Cut and fix tracks at appropriate centres according to Specification & manufactures instructions

S27:

Apply wall coverings according to Specification & manufactures instructions

S28:

Install door and window frames in accordance with drawings.

S29:

Fit cover trims and skirtings in accordance with Specification & manufactures instructions

S30:

Install glazing, blinds and manifestations to meet customer requirements

S31:

Hang door leaf complete with ironmongery including cutting and fitting of door furniture (eg hinges, levers, locks, closers and signage).

S32:

Cut and fix hangers in accordance with specification, manufacturers recommendations and FIS best practice guidlines

S33:

Install ceiling perimeter trim to level. Ensure trims are cut to length and form internal and external corner mitres.

S34:

Install subgrid eg hangers and heavy gauge channel to bridge services, heavy gauge channel between roof purlins

S35:

Fix secondary grid / cross tees ensuring grid is square and following manufacturers recommended installation. Form upstand using cross tee and appropriate trims or channels

S36:

Cut and install service tiles and pattresses e.g. form square and circular service cut outs through mineral tiles with plywood pattress or metal tiles and insulation pad

S37:

Complete tiling including: Perimeter tile cuts to mineral and metal tile; tegular tile edges to mineral tile; perimeter wedges for cut metal tiles; tile clips to back of mineral ceiling tiles; insulation pads to back of metal ceiling

S38:

Remove sections of ceiling and replace damaged grid & tile

Technical Educational Products

Reference:
OCC0388B
Status:
Approved occupation imageApproved occupation
Average (median) salary:
£33,010 per year
SOC 2020 code:
5321 Plasterers
  • SOC 2020 sub unit groups:
    • 5321/01 Dry liners
    • 8159/05 Ceiling fitters
B1:

Safety first approach

B2:

An attention to detail

B3:

Be able to work with others applying the principles of equality and diversity

B4:

Focus on timekeeping and productivity

B5:

Ability to work alone taking responsibility for completing of designated work in agreed schedule

B6:

Working towards high quality of all work completed with an understanding of impact of defects

Technical Educational Products

Reference:
OCC0388B
Status:
Approved occupation imageApproved occupation
Average (median) salary:
£33,010 per year
SOC 2020 code:
5321 Plasterers
  • SOC 2020 sub unit groups:
    • 5321/01 Dry liners
    • 8159/05 Ceiling fitters